The Little Lamb Preschool building was
    contracting in May of 2006 by Weese Construction. To
    the best of our knowledge all existing and new
    materials are free of asbestos products. The building
    was also inspected by James Barton III. A Certificate of
    Use and Occupancy  were given September 11, 2006.
    This verifies that construction, sewer, plumbing. drive
    way and flood zone meet county standards.         
          The Q.A.C. Health dept determined on Oct. 2009
    during their yearly inspection that the drinking water is
    of proper levels for consumption.
          The yearly Fire Marshal inspection was carried
    out September 2011 and the building meets all local
    fire codes.
    Sincerely,
    Wye Bible  Building Committee and
    L.L.P Board of Directors.